GNP Industries

GNP had 3 main issues, one Not enough lights, two the lights they did have failing and three the lights using way to much power. We reduced their power by 2/3 while at the same time more then doubling their light level while giving them a 5 year unconditional warranty.

CO2 reduction*
16.566611 tonnes

Savings*
$3,067.311

Power Savings*
21,789.746 kWH

*estimated values for GNP Industries since June 1, 2021

Solution Implemented

GNP had 3 main issues, one Not enough lights, two the lights they did have failing and three the lights using way to much power. We reduced their power by 2/3 while at the same time more then doubling their light level while giving them a 5 year unconditional warranty.

  • Increased Light output
  • 3/4th the power bill
  • New Modern Look

Approximate Client Savings

After 2.53 years GNP is expected to earn back all of their implementation cost. After that they are are expecting to enjoy $576.02 as monthly savings for remaining lifetime of project.

Date completed

June 1st, 2021

Installation Cost

$19,390.98

Project Lifetime

13 yrs

Expected ROI

2.53 yrs

Monthly Power Savings

$576.02

Lifetime Savings

$90,031.12

Some of our other projects

project thumbnail

  • New Solar powered lights
  • Saved $83,000 on trenching
  • $0 Power Charges

project thumbnail

  • Increased Light output
  • Reduced workplace mistakes

project thumbnail

  • Increased Light output
  • Reduced Power Bill

project thumbnail

  • Increased Light output
  • 3/4th the power bill
  • New Modern Look

Client Testimonies

©Efficient Eco Solutions